
Projects / Industrial & Data Centres
52 MW Data Centre, Dublin
A data centre campus development comprising two two-storey facilities of 32MW and 20MW, delivering 52MW of critical IT load across a 22-acre site.
Project Overview
A data centre campus development comprising two two-storey facilities of 32MW and 20MW, delivering 52MW of critical IT load across a 22-acre site. AOCA were appointed by the main contractor as quality auditor during construction to ensure the building envelope was installed as per design and specification. AOCA were on-site bi-weekly for the duration of the project inspecting all roofing and cladding elements across the campus.
Services Provided
Design review of roofing and cladding elements Quality audit inspections during construction As there was substantial M&E work carried out on the roof post completion by the roofing contractor, AOCA installed wireless temperature and humidity probes in the roof build up to ensure any potential water leaks were detected post PC of the roof.
In pictures

Planning something similar?
We'll walk you through how this project was delivered — and what we'd do on yours.





